HALT METHODOLOGY
The HALT methodology is focused on the design and manufacture of high-performance applications with commercial components.
The European Space Agency (ESA) awarded a contract to Alter Technology, Alén Space and Andalusian Foundation for Aerospace Development (FADA-CATEC) to carry out a test campaign to verify whether the HALT test method can validate the COTS commercial components in the field of aerospace engineering.
The project includes a testing program of several TOTEM platforms, the software-defined radio (SDR) developed by Alén Space.
› ESA Contract: Simulation of the life cycle of a product and determination areas of improvement in its design
› Execution: 2021
› Partners: Alter Technology, Alén Space and FADA-CATEC